Skip to product information
1 from 4
TROY LEE DESIGNS

Headset MTB TROY LEE DESIGNS FLOWLINE SE MIPS Black/Camo

The TROY LEE DESIGNS FLOWLINE SE mountain bike helmetequipped with Mips® technology and certified for eMTB electric bikes, sets a new benchmark in safety... Read more
Regular price 380,00 PLN
Regular price Sale price 380,00 PLN
View full details

Description

The TROY LEE DESIGNS FLOWLINE SE mountain bike helmetequipped with Mips® technology and certified for eMTB electric bikes, sets a new benchmark in safety with its modern, minimalist design and five-star safety rating from Virginia Tech.

With 14 air vents, it offers optimum ventilation to keep you comfortable on the trails. Its interior features an antimicrobial lining that ensures impeccable hygiene, even during the most intense outings. What's more, the magnetic closure system Fidlock® magnetic closure system magnetic closure system guarantees fast, convenient use.

Perfect for Trailthis rugged, high-performance helmet combines protection, comfort and functionality in a sleek design.

SIZES HEAD SIZE
XS/S 53-56 cm
M/L 57-59 cm
XL/XXL 60-63 cm

 

Ref: 9320466121053

Informations techniques

Weight (Manufacturer) : 375g

Adjustable visor 3-Way without visc(3 position) ;
Mips® B-Series, brain protection system against rotational impacts;
360° adjustable support system with 3-position rear height adjustment;
14 vents for maximum airflow;
Complete in-mold wrap-around construction;
Trail MTB helmet;
Fidlock magnetic loop system;
Dual-density EPS for low- and high-speed impacts;
Quick Dry Premium antimicrobial lining;
Side strap adjustment;
Certification: CPSC 1203, CE EN 1078, AS NZ 2063:2008*, E-bike certified NTA 8776 ;

Informations prix

*Recommended retail price February 2024